Moving off Sitecore or Adobe Experience Manager to a composable stack

Sound familiar?
If two of these are true, keep reading.
- The license renewal is on the calendar and the upgrade path is another multi-year program
- Marketing waits on a developer for changes that should take ten minutes
- Every agency you talk to recommends the platform it happens to partner with
- You want AI and agents working with your content, and the platform makes that hard
- Personalization was the reason you bought it, and almost nobody uses it
- Nobody can tell you which of your 40 templates are still in use
What waiting actually costs.
The renewal is the deadline
Most DXP exits are decided by a contract date, not a strategy. Start the selection well before renewal and you negotiate from a plan. Start at the last minute and you renew.
Every quarter adds content to move
Each new page, campaign, and locale on the old platform is one more thing to migrate. Waiting makes the move bigger, not easier.
AI raises the cost of standing still
Agents and answer engines read structured content through APIs. A page-centric DXP was not built for that, and the workarounds get more expensive every release.
How the Platform Selection runs.
Scoped to you, with a written scope before any work starts.
- 01
Inventory what you really run
Sites, templates, content types, integrations, personalization rules, and what actually gets used. The estate is usually smaller than the license suggests.
- 02
Agree the criteria before any demo
Content model, editor experience, integration, cost to run, and exit cost. Weighted with you, written down, before a single vendor gets to pitch.
- 03
Score the options
Headless CMS, commerce, and search candidates scored against your criteria and your content, with a working spike where a claim needs proving.
- 04
Recommend and phase
A written recommendation with the reasoning exposed, a lock-in assessment, and a migration plan split into scoped phases.
What lands on your desk.
A recommendation you can defend
Scored options, the reasoning behind the winner, and the reasons the others lost. Written so procurement and the board can follow it.
A lock-in and exit assessment
What it would cost to leave the new stack in five years, before you sign up for it.
A phased migration plan
Site by site or capability by capability, each phase with a written scope and a working result at the end.
The content inventory
What exists, what is used, and what can be retired instead of migrated. Often the cheapest decision in the whole program.
Three things to do Monday, with or without us.
Pull the template usage report
Ask your team for every template and how many live pages use it. Anything under five pages is a candidate to retire, not migrate.
Find the renewal date and the notice period
Then count back far enough to run a proper selection before it. That is when the work needs to start, whoever runs it.
Ask one vendor-neutral question
Ask every agency you speak to what they earn if you choose each option. The answers sort the advice quickly.
The engagements that answer it.
Each is scoped to you in writing before work starts.
- Platform SelectionA decision you can defend to a board, from the people who will live with the answer, without a six-figure selection exercise.
- Platform MigrationOne governed platform, migrated in phases you can see.
- Architecture ReviewA defensible diagnosis and a roadmap your team can start on Monday.
Where we have done this.
Great questions from inquiring minds
The questions people ask on the first call, answered here so the call can start further along.
How much does it cost to move off Sitecore or AEM?
It depends on the number of sites, content volume, and integrations, so every engagement is scoped to you. Platform Selection comes first, then a discovery and scoping step for the migration, so you have a real plan and a written scope before you commit to the build.
Which headless CMS should replace Sitecore?
It depends on your content model, editors, and integrations. We compare options such as Contentful, Contentstack, Storyblok, and Sanity, plus commerce and search, against your actual requirements. We have no preferred platform and earn nothing from any of them.
Can we migrate in stages instead of all at once?
Yes, and we recommend it. Most estates move site by site or capability by capability, with the old platform running alongside until each piece is proven.
How long does a full migration take?
It depends on the estate. A single brand site moves far faster than a multi-brand, multi-region estate, which runs in phases. The phase plan from Platform Selection tells you which, with a written scope for each phase.
What happens to our personalization and search?
We inventory what is actually configured and used, then decide per capability whether to rebuild it, replace it with a dedicated service, or retire it. Many teams find they use a fraction of what they pay for.
Do you do the migration yourselves?
Yes, through Platform Migration in phases with written change control. If you already have an integrator, we can provide the architecture and let them deliver.
Tell us what you are trying to build.
A journey that leaks, a platform you need to change, marketing you cannot measure, or an AI bill nobody can explain. Thirty minutes with someone senior, and a clear next step either way.
